Street Reconstruction Project

2018 ALLEY CONSTRUCTION UPDATES


Paving within the Oakwood neighborhood has been postponed till Monday (7/16/18) due to the wet conditions. An updated notice is attached. Please spread the word amongst your fellow neighbors! Thank you for your patience and cooperation!

 


Oakwood Drive, Robert Circle, and Oakwood Circle

Scope of Work

Sanitary Sewer, watermain and storm sewer will be replaced as part of this project. The contractor will begin this utility work on April 23rd. This process will take several weeks so please look for future updates on construction.
The contractor will begin removing the existing pavement along Oakwood Drive, Robert Circle, and Oakwood Circle on Monday, April 30th. The contractor will be reclaiming the existing pavement. This process includes grinding up the existing pavement and gravel base under the existing road, blending it together, then placing it back down. Please have all vehicles off of the street by 7 am on Monday, April 30th to allow the contractor to complete this process.


The Contractor will be setting up a temporary watermain along the project. The contractor will be coordinating a time with all homeowners to connect temporary watermain to your outside water spigot. The contractor will need to enter your house to turn off the water using the inside valve in order to disconnect your water service from the existing watermain. Your cooperation with the contractor is necessary to ensure this switch goes smoothly. Once the switch has been completed, turn on your outside water spigot and let water run to inspect for any leaks.
The temporary watermain will be in service until the new watermain is completely installed. A wye will be installed on your spigot so that you will still be able to use it for outside purposes while being hooked up to temporary water.


If you have any questions or concerns throughout construction, please call Luke Wheeler at 612-597-9105. Thank you for your patience and cooperation during construction.


Highway 169 Road Construction

Summary of work

  • Repair or replace concrete pavement on Hwy 169 from just south of Hwy 282 in Jordan to just north of Hwy 19 in Blakely Township
  • Construct Reduced Conflict Intersection (RCI) at Hwy 59/Delaware Ave
  • Install cable median barrier between Jordan and Belle Plaine
  • Jim's Apple Farm safety improvements

Click this link for more information.

Upcoming Events

S M T W T F S
 
 
 
 
1
 
2
 
3
 
4
 
5
 
6
 
7
 
8
 
9
 
10
 
11
 
12
 
13
 
14
 
15
 
16
 
17
 
18
 
19
 
20
 
21
 
22
 
23
 
24
 
25
 
26
 
27
 
28
 
 
 
 

Quick Links